1wbs

Identification of novel p38 alpha MAP Kinase inhibitors using fragment-based lead generation.

Method: X-RAY DIFFRACTION Dmax: 74.3 Å Quality: GOOD

SAXS 散射曲线 SAXS Profile

SAXS profile for 1wbs

P(r) 距离分布 P(r) Distribution

P(r) distribution for 1wbs
下载 Download

1. 结构基本信息 1. Structure Basics

条目编号 entry_id1wbs
沉积日期 deposition_date2004-11-05
结构标题 titleIdentification of novel p38 alpha MAP Kinase inhibitors using fragment-based lead generation.
关键词 keywords;P38, MAP KINASE, INHIBITOR STRUCTURE, ALTERNATIVE SPLICING, ATP-BINDING, NUCLEAR PROTEIN, PHOSPHORYLATION, SERINE/THREONINE PROTEIN KINASE, TRANSFERASE ;; TRANSFERASE
实验方法 methodX-RAY DIFFRACTION

2. SAXS 参数 (CRYSOL 理论计算) 2. SAXS Parameters (CRYSOL)

回转半径 Rg (Guinier) rg_guinier22.65
回转半径 Rg (电子) rg_electron21.62
零角强度 I(0) i027207700.00
分子量 molecular_weight40739.0 kDa
排除体积 excluded_volume51356 ų
包络体积 envelope_volume61123 ų
水化壳体积 shell_volume23602 ų
包络直径 envelope_diameter73.3
壳层 Rg shell_rg28.48
包络 Rg envelope_rg21.81
形状 Rg shape_rg21.60
总 Rg total_rg22.55
总原子数 total_atoms2873
残基数 n_residues352
球谐函数阶数 n_harmonics20
q 范围 q_range— – 0.5000 −1
数据点数 n_points101
壳层类型 shell_typedirectional
溶剂电子密度 solvent_density0.3340 e/ų
壳层衬度 contrast_shell0.0300 e/ų
CRYSOL 版本 crysol_version4.1.3

3. P(r) 距离分布 (GNOM 反演) 3. P(r) Analysis (GNOM)

最大尺寸 Dmax dmax74.3
Rg (实空间) rg_real22.59
Rg 误差 (实空间) rg_real_error0.49
I(0) (实空间) i0_real2.7210e+07
I(0) 误差 (实空间) i0_real_error3.5650e+05
Rg (倒空间) rg_reciprocal22.61
I(0) (倒空间) i0_reciprocal27210000.0000
解质量估计 total_estimate0.8889
解质量评级 solution_quality GOOD a GOOD solution
P(r) 峰数 n_peaks2
主峰位置 r_peak_primary25.9
偏度 Skewness skewness0.303
峰度 Kurtosis kurtosis-0.308
角度范围 angular_range— – 0.3500 −1
当前正则化参数 α current_alpha0.0000
最高正则化参数 α highest_alpha5830000.0000
实空间数据点数 n_real_points67
GNOM 版本 gnom_version4.1.3
质量判据 quality_criteria AN1: 0.000; Oscil: 0.853; Stabil: 1.000; Sysdev: 1.000; Positv: 1.000; Valcen: 1.000; Smooth: 0.993

4. 晶体学与实验 4. Crystallography & Experiment

5. 实体与聚合体信息 (4)

6. 折叠分类 (SCOP + CATH) 3 domains

SCOP 2.08 (1 domains)

结构域编号 domain_idd1wbsa_
类 Class classd — Alpha and beta proteins (a+b)
折叠类型 Fold foldd.144 — Protein kinase-like (PK-like)
超家族 Superfamily superfamilyd.144.1 — Protein kinase-like (PK-like)
家族 Family familyd.144.1.7 — Protein kinases, catalytic subunit

CATH v4.4 (2 domains)

结构域编号 domain_id1wbsA01
类 Class class3 — Alpha Beta
架构 Architecture architecture30 — 2-Layer Sandwich
拓扑 Topology topology200 — Phosphorylase Kinase; domain 1
同源超家族 H-superfamily homologous superfamily20 — Phosphorylase Kinase; domain 1
结构域编号 domain_id1wbsA02
类 Class class1 — Mainly Alpha
架构 Architecture architecture10 — Orthogonal Bundle
拓扑 Topology topology510 — Transferase(Phosphotransferase); domain 1
同源超家族 H-superfamily homologous superfamily10 — Transferase(Phosphotransferase) domain 1

7. 引用文献 (1)

8. 文件与曲线 (10)