Cystic fibrosis transmembrane conductance regulator
Homo sapiens
State in the Current Structure
| Assembly | Oligomeric State | Construct | Mutations and Modifications | Ligands, Ions and Associated Components | Method and Experimental Conditions | Structure Quality |
|---|---|---|---|---|---|---|
| 1 | Protein monomer Monomer Protein × 1 PDB declaration: monomeric(1) Consistent with protein copy count | Chain A; UniProt 388–646 | Mutation:deltaF508, V510D, delta405-436 | ATP ADENOSINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 | X-RAY DIFFRACTION X-ray crystallization conditions:VAPOR DIFFUSION, SITTING DROP;pH 7.5;277 K;CFTR NBD1 V510D in buffer A was crystallized by mixing equal amounts of protein at 6 mg/mL with 0.1 M Tris pH 7.6, 28% (w/v) polyethylene glycol 10,000. Crystallization was induced by streak-seeding using crystals grown in 0.1 M HEPES, pH 7.5, 25% (w/v) polyethylene glycol 550 monomethylether, and plates incubated at 4C. Crystals grew over several days and were frozen by quick dip in reservoir solution supplemented with 25% (w/v) ethylene glycol | Resolution 1.86 Å R-free 0.213 |
| 2 | Protein monomer Monomer Protein × 1 PDB declaration: monomeric(1) Consistent with protein copy count | Chain B; UniProt 388–646 | Mutation:deltaF508, V510D, delta405-436 | ATP ADENOSINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 | X-RAY DIFFRACTION X-ray crystallization conditions:VAPOR DIFFUSION, SITTING DROP;pH 7.5;277 K;CFTR NBD1 V510D in buffer A was crystallized by mixing equal amounts of protein at 6 mg/mL with 0.1 M Tris pH 7.6, 28% (w/v) polyethylene glycol 10,000. Crystallization was induced by streak-seeding using crystals grown in 0.1 M HEPES, pH 7.5, 25% (w/v) polyethylene glycol 550 monomethylether, and plates incubated at 4C. Crystals grew over several days and were frozen by quick dip in reservoir solution supplemented with 25% (w/v) ethylene glycol | Resolution 1.86 Å R-free 0.213 |
Other States of the Same Protein in the Database
Each row is a biological assembly of the same UniProt protein in another PDB entry. The “Difference from current entry” column identifies evidence-level differences; no tag means the currently parsed fields agree.
| Other PDB | Difference from Current Entry 6WBS | Assembly / Oligomeric State | Construct | Mutations and Modifications | Ligands, Ions and Non-polymers | Method and Experimental Conditions | Structure Quality |
|---|---|---|---|---|---|---|---|
| 1XMI Crystal structure of human F508A NBD1 domain with ATP Deposited 2004-10-02 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein homooligomer Homooligomer;Protein × 5 PDB declaration: pentameric |
Chain A
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain B
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain C
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain D
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain E
388–678(291 aa)
Fragment:nucleotide binding domain one
|
Mutation:F508A Mutation:F508A Mutation:F508A Mutation:F508A Mutation:F508A | MG MAGNESIUM ION × 5 ATP ADENOSINE-5'-TRIPHOSPHATE × 5 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 4.5;277 K;PEG 400, glycerol, ethylene glycol, tris, pH 4.5, VAPOR DIFFUSION, HANGING DROP, temperature 277K
|
Resolution 2.25 Å R-free 0.265 |
| 1XMI Crystal structure of human F508A NBD1 domain with ATP Deposited 2004-10-02 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 2 Protein homooligomer Homooligomer;Protein × 10 PDB declaration: decameric |
Chain A
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain B
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain C
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain D
388–678(291 aa)
Fragment:nucleotide binding domain one
Chain E
388–678(291 aa)
Fragment:nucleotide binding domain one
|
Mutation:F508A Mutation:F508A Mutation:F508A Mutation:F508A Mutation:F508A | MG MAGNESIUM ION × 10 ATP ADENOSINE-5'-TRIPHOSPHATE × 10 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 4.5;277 K;PEG 400, glycerol, ethylene glycol, tris, pH 4.5, VAPOR DIFFUSION, HANGING DROP, temperature 277K
|
Resolution 2.25 Å R-free 0.265 |
| 1XMJ Crystal structure of human deltaF508 human NBD1 domain with ATP Deposited 2004-10-02 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
388–678(291 aa)
Fragment:nucleotide binding domain one
|
Mutation:deltaF508 | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 7.5;277 K;PEG 4000, glycerol, ethylene glycol, tris, pH 7.5, VAPOR DIFFUSION, HANGING DROP, temperature 277K
|
Resolution 2.30 Å R-free 0.287 |
| 2BBO Human NBD1 with Phe508 Deposited 2005-10-17 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
389–678(290 aa)
Fragment:residues 389-678
|
Mutation:F409L, F429S, F433L, G550E, R553Q, R555K, H667R | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 9;280 K;30% PEG4000, 0.2M LiCl, 50mM Tris, pH 9, 3mM ATP, 5mM MgCl2, 2mM TCEP, pH 9.0, VAPOR DIFFUSION, HANGING DROP, temperature 280K
|
Resolution 2.55 Å R-free 0.274 |
| 2BBS Human deltaF508 NBD1 with three solubilizing mutations Deposited 2005-10-17 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
389–678(290 aa)
Fragment:residues 389-678
|
Mutation:F429S, F494N, Q636R | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 9;280 K;39% PEG4000, 0.1M LiCl, 50mM Tris, pH 9.0, 3mM ATP, 5mM MgCl2, 2mM TCEP, VAPOR DIFFUSION, HANGING DROP, temperature 280K
|
Resolution 2.05 Å R-free 0.291 |
| 2BBS Human deltaF508 NBD1 with three solubilizing mutations Deposited 2005-10-17 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 2 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
389–678(290 aa)
Fragment:residues 389-678
|
Mutation:F429S, F494N, Q636R | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 9;280 K;39% PEG4000, 0.1M LiCl, 50mM Tris, pH 9.0, 3mM ATP, 5mM MgCl2, 2mM TCEP, VAPOR DIFFUSION, HANGING DROP, temperature 280K
|
Resolution 2.05 Å R-free 0.291 |
| 2BBT Human deltaF508 NBD1 with two solublizing mutations. Deposited 2005-10-17 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
389–678(290 aa)
Fragment:residues 389-678
|
Mutation:F504N, Q646R | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 7.5;280 K;35% PEG4000, 0.2M LiCl, 50mM Tris pH 7.5, 3mM ATP, 5mM MgCl2, 2mM TCEP, VAPOR DIFFUSION, HANGING DROP, temperature 280K
|
Resolution 2.30 Å R-free 0.295 |
| 2BBT Human deltaF508 NBD1 with two solublizing mutations. Deposited 2005-10-17 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 2 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
389–678(290 aa)
Fragment:residues 389-678
|
Mutation:F504N, Q646R | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 7.5;280 K;35% PEG4000, 0.2M LiCl, 50mM Tris pH 7.5, 3mM ATP, 5mM MgCl2, 2mM TCEP, VAPOR DIFFUSION, HANGING DROP, temperature 280K
|
Resolution 2.30 Å R-free 0.295 |
| 2LOB PDZ Domain of CAL (Cystic Fibrosis Transmembrane Regulator-Associated Ligand) Deposited 2012-01-20 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain B
1473–1480(8 aa)
Fragment:PDZ-binding motif residues 1473-1480
|
Not recorded | No recorded non-water small molecule |
SOLUTION NMR
NMR measurement conditions
pH 6.8;310 K;Ionic strength (raw mmCIF value) 1.0;Pressure ambient
NMR sample composition
1.0 mM [U-100% 13C; U-100% 15N] protein_1, 90% H2O/10% D2O | 90% H2O/10% D2O
|
Resolution not provided |
| 2PZE Minimal human CFTR first nucleotide binding domain as a head-to-tail dimer Deposited 2007-05-17 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–404(18 aa)
Fragment:CFTR NBD1 387-646(del405-436)
Chain A
437–646(210 aa)
Fragment:CFTR NBD1 387-646(del405-436)
|
Mutation:del405-436 Mutation:del405-436 | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;pH 7.5;281 K;Protein: 9.5mg/ml NBD1, 0.15M NaCl, 0.01M methionine, 0.01M HEPES pH 7.5, 10% glycerol, 0.001M TCEP, 0.002M ATP; Well: 0.1M Hepes pH 7.5, 25% PEG 6K; Cryo: 25% DMSO, vapor diffusion, temperature 281K
|
Resolution 1.70 Å R-free 0.247 |
| 2PZE Minimal human CFTR first nucleotide binding domain as a head-to-tail dimer Deposited 2007-05-17 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 2 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
387–404(18 aa)
Fragment:CFTR NBD1 387-646(del405-436)
Chain B
437–646(210 aa)
Fragment:CFTR NBD1 387-646(del405-436)
|
Mutation:del405-436 Mutation:del405-436 | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;pH 7.5;281 K;Protein: 9.5mg/ml NBD1, 0.15M NaCl, 0.01M methionine, 0.01M HEPES pH 7.5, 10% glycerol, 0.001M TCEP, 0.002M ATP; Well: 0.1M Hepes pH 7.5, 25% PEG 6K; Cryo: 25% DMSO, vapor diffusion, temperature 281K
|
Resolution 1.70 Å R-free 0.247 |
| 2PZF Minimal human CFTR first nucleotide binding domain as a head-to-tail dimer with delta F508 Deposited 2007-05-18 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–404(18 aa)
Fragment:CFTR NBD1 387-646
Chain A
437–646(210 aa)
Fragment:CFTR NBD1 387-646
|
Mutation:del405-436, delF508 Mutation:del405-436, delF508 | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;pH 8.5;281 K;Protein: 9.5mg/ml NBD1, 0.15M NaCl, 0.01M methionine, 0.01M HEPES pH 7.5, 10% glycerol, 0.001M TCEP, 0.002M ATP; Well: 0.1M Tris pH 8.5, 35% PEG 4K, 0.2M NaAcetate; Cryo: 25% DMSO, vapor diffusion, temperature 281K
|
Resolution 2.00 Å R-free 0.251 |
| 2PZF Minimal human CFTR first nucleotide binding domain as a head-to-tail dimer with delta F508 Deposited 2007-05-18 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 2 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
387–404(18 aa)
Fragment:CFTR NBD1 387-646
Chain B
437–646(210 aa)
Fragment:CFTR NBD1 387-646
|
Mutation:del405-436, delF508 Mutation:del405-436, delF508 | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;pH 8.5;281 K;Protein: 9.5mg/ml NBD1, 0.15M NaCl, 0.01M methionine, 0.01M HEPES pH 7.5, 10% glycerol, 0.001M TCEP, 0.002M ATP; Well: 0.1M Tris pH 8.5, 35% PEG 4K, 0.2M NaAcetate; Cryo: 25% DMSO, vapor diffusion, temperature 281K
|
Resolution 2.00 Å R-free 0.251 |
| 2PZF Minimal human CFTR first nucleotide binding domain as a head-to-tail dimer with delta F508 Deposited 2007-05-18 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 3 Protein homooligomer Homooligomer;Protein × 2 PDB declaration: dimeric |
Chain A
387–404(18 aa)
Fragment:CFTR NBD1 387-646
Chain A
437–646(210 aa)
Fragment:CFTR NBD1 387-646
Chain B
387–404(18 aa)
Fragment:CFTR NBD1 387-646
Chain B
437–646(210 aa)
Fragment:CFTR NBD1 387-646
|
Mutation:del405-436, delF508 Mutation:del405-436, delF508 Mutation:del405-436, delF508 Mutation:del405-436, delF508 | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;pH 8.5;281 K;Protein: 9.5mg/ml NBD1, 0.15M NaCl, 0.01M methionine, 0.01M HEPES pH 7.5, 10% glycerol, 0.001M TCEP, 0.002M ATP; Well: 0.1M Tris pH 8.5, 35% PEG 4K, 0.2M NaAcetate; Cryo: 25% DMSO, vapor diffusion, temperature 281K
|
Resolution 2.00 Å R-free 0.251 |
| 2PZG Minimal human CFTR first nucleotide binding domain as a monomer Deposited 2007-05-18 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
375–404(30 aa)
Fragment:CFTR NBD1 375-646(del405-436)
Chain A
437–646(210 aa)
Fragment:CFTR NBD1 375-646(del405-436)
|
Mutation:del405-436 Mutation:del405-436 | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 GOL GLYCEROL × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;pH 6.5;281 K;Protein: 9.5mg/ml NBD1, 0.15M NaCl, 0.01M methionine, 0.01M HEPES pH 7.5, 10% glycerol, 0.001M TCEP, 0.002M ATP; Well: 0.1M Hepes pH 6.5, 25% PEG 10K ; Cryo: 25% glycerol, vapor diffusion, temperature 281K
|
Resolution 1.80 Å R-free 0.234 |
| 2PZG Minimal human CFTR first nucleotide binding domain as a monomer Deposited 2007-05-18 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 2 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
375–404(30 aa)
Fragment:CFTR NBD1 375-646(del405-436)
Chain B
437–646(210 aa)
Fragment:CFTR NBD1 375-646(del405-436)
|
Mutation:del405-436 Mutation:del405-436 | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 GOL GLYCEROL × 2 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;pH 6.5;281 K;Protein: 9.5mg/ml NBD1, 0.15M NaCl, 0.01M methionine, 0.01M HEPES pH 7.5, 10% glycerol, 0.001M TCEP, 0.002M ATP; Well: 0.1M Hepes pH 6.5, 25% PEG 10K ; Cryo: 25% glycerol, vapor diffusion, temperature 281K
|
Resolution 1.80 Å R-free 0.234 |
| 3GD7 Crystal structure of human NBD2 complexed with N6-Phenylethyl-ATP (P-ATP) Deposited 2009-02-23 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Insufficient information Monomer;Protein × 1 PDB declaration: monomeric |
Chain D
1193–1427(235 aa)
|
Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D | B44 N-(2-phenylethyl)adenosine 5'-(tetrahydrogen triphosphate) × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;277 K;1.1-1.25 M tri-sodium citrate, pH 5.5-8, sitting drop, temperature 277K, VAPOR DIFFUSION
|
Resolution 2.70 Å R-free 0.308 |
| 3GD7 Crystal structure of human NBD2 complexed with N6-Phenylethyl-ATP (P-ATP) Deposited 2009-02-23 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 2 Insufficient information Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
1193–1427(235 aa)
|
Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D | B44 N-(2-phenylethyl)adenosine 5'-(tetrahydrogen triphosphate) × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;277 K;1.1-1.25 M tri-sodium citrate, pH 5.5-8, sitting drop, temperature 277K, VAPOR DIFFUSION
|
Resolution 2.70 Å R-free 0.308 |
| 3GD7 Crystal structure of human NBD2 complexed with N6-Phenylethyl-ATP (P-ATP) Deposited 2009-02-23 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 3 Insufficient information Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
1193–1427(235 aa)
|
Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D | B44 N-(2-phenylethyl)adenosine 5'-(tetrahydrogen triphosphate) × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;277 K;1.1-1.25 M tri-sodium citrate, pH 5.5-8, sitting drop, temperature 277K, VAPOR DIFFUSION
|
Resolution 2.70 Å R-free 0.308 |
| 3GD7 Crystal structure of human NBD2 complexed with N6-Phenylethyl-ATP (P-ATP) Deposited 2009-02-23 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 4 Insufficient information Monomer;Protein × 1 PDB declaration: monomeric |
Chain C
1193–1427(235 aa)
|
Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D | B44 N-(2-phenylethyl)adenosine 5'-(tetrahydrogen triphosphate) × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;277 K;1.1-1.25 M tri-sodium citrate, pH 5.5-8, sitting drop, temperature 277K, VAPOR DIFFUSION
|
Resolution 2.70 Å R-free 0.308 |
| 3GD7 Crystal structure of human NBD2 complexed with N6-Phenylethyl-ATP (P-ATP) Deposited 2009-02-23 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 5 Insufficient information Homooligomer;Protein × 4 PDB declaration: tetrameric |
Chain A
1193–1427(235 aa)
Chain B
1193–1427(235 aa)
Chain C
1193–1427(235 aa)
Chain D
1193–1427(235 aa)
|
Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D Mutation:Q1280E, Y1307N, E1308A, Q1309A, W1310H, H1402A, Q1411D | B44 N-(2-phenylethyl)adenosine 5'-(tetrahydrogen triphosphate) × 4 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION;277 K;1.1-1.25 M tri-sodium citrate, pH 5.5-8, sitting drop, temperature 277K, VAPOR DIFFUSION
|
Resolution 2.70 Å R-free 0.308 |
| 3ISW Crystal structure of filamin-A immunoglobulin-like repeat 21 bound to an N-terminal peptide of CFTR Deposited 2009-08-27 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain C
5–22(18 aa)
Fragment:UNP residues 5-22
|
Mutation:R21A | No recorded non-water small molecule |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 7;293 K;0.1M Bis-Tris Propane pH 7.0, 60% Tacsimate, VAPOR DIFFUSION, HANGING DROP, temperature 293K
|
Resolution 2.80 Å R-free 0.298 |
| 4WZ6 Human CFTR aa389-678 (NBD1), deltaF508 with three solubilizing mutations, bound ATP Deposited 2014-11-18 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
389–678(290 aa)
Fragment:UNP residues 389-678
|
Mutation:F429S, F494N, deltaF508, Q637R | ATP ADENOSINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, SITTING DROP;pH 8.5;283 K;0.2M Magnesium Chloride, 0.1M Tris-HCl pH8.5, 33% PEG 4000
|
Resolution 2.05 Å R-free 0.239 |
| 5D2D Crystal structure of human 14-3-3 zeta in complex with CFTR R-domain peptide pS753-pS768 Deposited 2015-08-05 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Other combination Heteromer;Protein × 3 PDB declaration: trimeric |
Chain C
747–774(28 aa)
Fragment:UNP residues 747-774
|
Non-standard monomer:Yes (specific site not provided by mmCIF) | CL CHLORIDE ION × 4 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 4.5;277 K;HEPES, NaCl, DTT, Li2SO4, Glycine, K2HPO4
|
Resolution 2.10 Å R-free 0.220 |
| 5D3E Crystal structure of human 14-3-3 gamma in complex with CFTR R-domain peptide pS768-pS795 Deposited 2015-08-06 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain C
762–801(40 aa)
Fragment:UNP residues 762-801
|
Non-standard monomer:Yes (specific site not provided by mmCIF) | No recorded non-water small molecule |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, SITTING DROP;pH 7.5;293 K;HEPES, NaCl, DTT, (NH4)2SO4, Poly(acrylic acid sodium salt 2100
|
Resolution 2.75 Å R-free 0.244 |
| 5D3E Crystal structure of human 14-3-3 gamma in complex with CFTR R-domain peptide pS768-pS795 Deposited 2015-08-06 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 2 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain G
762–801(40 aa)
Fragment:UNP residues 762-801
|
Non-standard monomer:Yes (specific site not provided by mmCIF) | No recorded non-water small molecule |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, SITTING DROP;pH 7.5;293 K;HEPES, NaCl, DTT, (NH4)2SO4, Poly(acrylic acid sodium salt 2100
|
Resolution 2.75 Å R-free 0.244 |
| 5D3E Crystal structure of human 14-3-3 gamma in complex with CFTR R-domain peptide pS768-pS795 Deposited 2015-08-06 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 3 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain K
762–801(40 aa)
Fragment:UNP residues 762-801
|
Non-standard monomer:Yes (specific site not provided by mmCIF) | No recorded non-water small molecule |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, SITTING DROP;pH 7.5;293 K;HEPES, NaCl, DTT, (NH4)2SO4, Poly(acrylic acid sodium salt 2100
|
Resolution 2.75 Å R-free 0.244 |
| 5D3F Crystal structure of human 14-3-3 zeta in complex with CFTR R-domain peptide pS753-pS768 and stabilizer fusicoccin-A Deposited 2015-08-06 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain C
747–774(28 aa)
Fragment:UNP residues 747-774
|
Non-standard monomer:Yes (specific site not provided by mmCIF) | FSC FUSICOCCIN × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;pH 6.5;277 K;HEPES, NaCl, DTT, PEG6000
|
Resolution 2.74 Å R-free 0.303 |
| 5TF7 Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with ATP Deposited 2016-09-24 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 ATP ADENOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.93 Å R-free 0.200 |
| 5TF8 Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with dTTP Deposited 2016-09-24 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | TTP THYMIDINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer:containing 150 mM NaCl, 30% (v/v) glycerol, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5, Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.86 Å R-free 0.187 |
| 5TFA Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with dUTP Deposited 2016-09-24 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | DUT DEOXYURIDINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer: 150 mM NaCl, 30% (v/v) glycerol, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5;
Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.87 Å R-free 0.195 |
| 5TFB Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with 7-methyl-GTP Deposited 2016-09-24 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 MGP 7-METHYL-GUANOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer: 150 mM NaCl, 30% (v/v) glycerol, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5
Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.87 Å R-free 0.199 |
| 5TFC Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with GTP Deposited 2016-09-24 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 GTP GUANOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer: 150 mM NaCl, 30% (v/v) glycerol, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5;
Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.92 Å R-free 0.201 |
| 5TFD Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with CTP Deposited 2016-09-24 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 CTP CYTIDINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;279 K;Protein buffer: 150 mM NaCl, 30% (v/v) glycerol, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5;
Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.89 Å R-free 0.195 |
| 5TFF Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with UTP Deposited 2016-09-25 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 UTP URIDINE 5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer: 150 mM NaCl, 30% (v/v) glycerol, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5;
Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.89 Å R-free 0.190 |
| 5TFG Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with 5-methyl-UTP Deposited 2016-09-25 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 M5T 5-Methyluridine triphosphate × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;279 K;Protein buffer: 150 mM NaCl, 30% (v/v) glycerol, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5;
Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.91 Å R-free 0.184 |
| 5TFI Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with dGTP Deposited 2016-09-25 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 DGT 2'-DEOXYGUANOSINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer: 150 mM NaCl, 10% (v/v) glycerol,10% (v/v) Ethylene glycol, 10mM MgCl2, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5. Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.89 Å R-free 0.201 |
| 5TFJ Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with dCTP Deposited 2016-09-25 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 DCP 2'-DEOXYCYTIDINE-5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer: 150 mM NaCl, 10% (v/v) glycerol,10% (v/v) Ethylene glycol, 10mM MgCl2, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5. Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.85 Å R-free 0.185 |
| 5TGK Nucleotide-binding domain 1 of the human cystic fibrosis transmembrane conductance regulator (CFTR) with dATP Deposited 2016-09-28 | Different construct Different mutation/modification Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
387–646(260 aa)
Fragment:Nucleotide-binding domain 1 (UNP residues 387-646)
|
Mutation:V470M | MG MAGNESIUM ION × 1 DTP 2'-DEOXYADENOSINE 5'-TRIPHOSPHATE × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;pH 7.5;279 K;Protein buffer: 150 mM NaCl, 10% (v/v) glycerol,10% (v/v) Ethylene glycol, 10mM MgCl2, 1 mM TCEP, and 20 mM Na-HEPES, pH 7.5. Precipitant buffer: 40% (v/v) PEG 400, 100 mM NH4Cl, and 100 mM MES, pH 6
|
Resolution 1.91 Å R-free 0.198 |
| 5UAK Dephosphorylated, ATP-free human cystic fibrosis transmembrane conductance regulator (CFTR) Deposited 2016-12-19 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Not recorded | No recorded non-water small molecule |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.87 Å |
| 6HEP Crystal structure of human 14-3-3 beta in complex with CFTR R-domain peptide pS753-pS768 Deposited 2018-08-20 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain E
747–774(28 aa)
|
Non-standard monomer:Yes (specific site not provided by mmCIF) | ETE 2-{2-[2-2-(METHOXY-ETHOXY)-ETHOXY]-ETHOXY}-ETHANOL × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, SITTING DROP;pH 8;278 K;0.1M Tris, 25% v/v PEG350 MME
|
Resolution 1.86 Å R-free 0.251 |
| 6HEP Crystal structure of human 14-3-3 beta in complex with CFTR R-domain peptide pS753-pS768 Deposited 2018-08-20 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 2 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain F
747–774(28 aa)
|
Non-standard monomer:Yes (specific site not provided by mmCIF) | ETE 2-{2-[2-2-(METHOXY-ETHOXY)-ETHOXY]-ETHOXY}-ETHANOL × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, SITTING DROP;pH 8;278 K;0.1M Tris, 25% v/v PEG350 MME
|
Resolution 1.86 Å R-free 0.251 |
| 6MSM Phosphorylated, ATP-bound human cystic fibrosis transmembrane conductance regulator (CFTR) Deposited 2018-10-16 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 POV (2S)-3-(hexadecanoyloxy)-2-[(9Z)-octadec-9-enoyloxy]propyl 2-(trimethylammonio)ethyl phosphate × 5 CLR CHOLESTEROL × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.20 Å |
| 6O1V Complex of human cystic fibrosis transmembrane conductance regulator (CFTR) and GLPG1837 Deposited 2019-02-21 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Not recorded | LJP N-(3-carbamoyl-5,5,7,7-tetramethyl-4,7-dihydro-5H-thieno[2,3-c]pyran-2-yl)-1H-pyrazole-3-carboxamide × 1 MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 POV (2S)-3-(hexadecanoyloxy)-2-[(9Z)-octadec-9-enoyloxy]propyl 2-(trimethylammonio)ethyl phosphate × 5 CLR CHOLESTEROL × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.20 Å |
| 6O2P Complex of ivacaftor with cystic fibrosis transmembrane conductance regulator (CFTR) Deposited 2019-02-24 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Not recorded | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 POV (2S)-3-(hexadecanoyloxy)-2-[(9Z)-octadec-9-enoyloxy]propyl 2-(trimethylammonio)ethyl phosphate × 6 AJP Digitonin × 1 VX7 N-(2,4-di-tert-butyl-5-hydroxyphenyl)-4-oxo-1,4-dihydroquinoline-3-carboxamide × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.30 Å |
| 6RQR Extended NHERF1 PDZ2 domain in complex with the PDZ-binding motif of CFTR Deposited 2019-05-16 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Insufficient information Homooligomer;Protein × 2 PDB declaration: dimeric |
Chain A
1477–1480(4 aa)
Chain B
1477–1480(4 aa)
|
Not recorded | No recorded non-water small molecule |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;288 K;1.65 M ammonium sulphate, 100 mM tri-sodium citrate pH 5.6
|
Resolution 2.20 Å R-free 0.233 |
| 6UK1 Crystal structure of nucleotide-binding domain 2 (NBD2) of the human Cystic Fibrosis Transmembrane Conductance Regulator (CFTR) Deposited 2019-10-03 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
1202–1430(229 aa)
|
Mutation:S1255L,Q1280E,K1292D,Y1307N,K1334G,S1359A,Q1411D,H1402A,Q1411D | ATP ADENOSINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;277 K;24% PEG 8000, 100 mM Li2SO4, 10mM NaBr, 100 mM Bis-Tris Propane pH 6.0
|
Resolution 2.69 Å R-free 0.304 |
| 6UK1 Crystal structure of nucleotide-binding domain 2 (NBD2) of the human Cystic Fibrosis Transmembrane Conductance Regulator (CFTR) Deposited 2019-10-03 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 2 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
1202–1430(229 aa)
|
Mutation:S1255L,Q1280E,K1292D,Y1307N,K1334G,S1359A,Q1411D,H1402A,Q1411D | ATP ADENOSINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;277 K;24% PEG 8000, 100 mM Li2SO4, 10mM NaBr, 100 mM Bis-Tris Propane pH 6.0
|
Resolution 2.69 Å R-free 0.304 |
| 6UK1 Crystal structure of nucleotide-binding domain 2 (NBD2) of the human Cystic Fibrosis Transmembrane Conductance Regulator (CFTR) Deposited 2019-10-03 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 3 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain C
1202–1430(229 aa)
|
Mutation:S1255L,Q1280E,K1292D,Y1307N,K1334G,S1359A,Q1411D,H1402A,Q1411D | ATP ADENOSINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;277 K;24% PEG 8000, 100 mM Li2SO4, 10mM NaBr, 100 mM Bis-Tris Propane pH 6.0
|
Resolution 2.69 Å R-free 0.304 |
| 6UK1 Crystal structure of nucleotide-binding domain 2 (NBD2) of the human Cystic Fibrosis Transmembrane Conductance Regulator (CFTR) Deposited 2019-10-03 | Different construct Different mutation/modification Different experimental conditions Different structure-quality metrics | Assembly 4 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain D
1202–1430(229 aa)
|
Mutation:S1255L,Q1280E,K1292D,Y1307N,K1334G,S1359A,Q1411D,H1402A,Q1411D | ATP ADENOSINE-5'-TRIPHOSPHATE × 1 MG MAGNESIUM ION × 1 |
X-RAY DIFFRACTION
X-ray crystallization conditions
MICROBATCH;277 K;24% PEG 8000, 100 mM Li2SO4, 10mM NaBr, 100 mM Bis-Tris Propane pH 6.0
|
Resolution 2.69 Å R-free 0.304 |
| 7QI1 Crystal structure of human 14-3-3 protein beta in complex with CFTR peptide pS753pS768 and PPI stabilizer CY007424 Deposited 2021-12-14 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 6 PDB declaration: octameric |
Chain E
747–774(28 aa)
Chain F
747–774(28 aa)
|
Non-standard monomer:Yes (specific site not provided by mmCIF) Non-standard monomer:Yes (specific site not provided by mmCIF) | ARG ARGININE × 2 Q95 [2-(2-methylphenyl)sulfanylphenyl]methanamine × 2 TYR TYROSINE × 2 GLN GLUTAMINE × 2 |
X-RAY DIFFRACTION
X-ray crystallization conditions
VAPOR DIFFUSION, HANGING DROP;277 K;Qiagen Cryos Suite #44 (0.09 M HEPES sodium salt pH7.5, 1.26M tri-sodium citrate, 10% (v/v) glycerol) with an extra 2% (v/v) of glycerol.
|
Resolution 1.76 Å R-free 0.241 |
| 7SV7 The complex of phosphorylated human cystic fibrosis transmembrane conductance regulator (CFTR) with ATP/Mg and Tezacaftor (VX-661) Deposited 2021-11-18 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 DD9 nonane × 2 D12 DODECANE × 4 CLR CHOLESTEROL × 2 C14 TETRADECANE × 1 PJ8 heptadecane × 1 CV6 Tezacaftor × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.80 Å |
| 7SVD The complex of phosphorylated human cystic fibrosis transmembrane conductance regulator (CFTR) with ATP/Mg and Lumacaftor (VX-809) Deposited 2021-11-18 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 D12 DODECANE × 1 D10 DECANE × 2 CLR CHOLESTEROL × 3 VX8 Lumacaftor × 1 UNX UNKNOWN LIGAND × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 2.70 Å |
| 7SVR The complex of dephosphorylated human cystic fibrosis transmembrane conductance regulator (CFTR) and Lumacaftor (VX-809) Deposited 2021-11-19 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Not recorded | VX8 Lumacaftor × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.90 Å |
| 8EIG The complex of phosphorylated human delta F508 cystic fibrosis transmembrane conductance regulator (CFTR) with elexacaftor (VX-445) and ATP/Mg Deposited 2022-09-15 | Different construct Different mutation/modification Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 CLR CHOLESTEROL × 1 WJX (6P)-N-(1,3-dimethyl-1H-pyrazole-4-sulfonyl)-6-[3-(3,3,3-trifluoro-2,2-dimethylpropoxy)-1H-pyrazol-1-yl]-2-[(4S)-2,2,4-trimethylpyrrolidin-1-yl]pyridine-3-carboxamide × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.60 Å |
| 8EIO The complex of phosphorylated human delta F508 cystic fibrosis transmembrane conductance regulator (CFTR) with elexacaftor (VX-445), lumacaftor (VX-809) and ATP/Mg Deposited 2022-09-15 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 CLR CHOLESTEROL × 1 D12 DODECANE × 1 VX8 Lumacaftor × 1 WJX (6P)-N-(1,3-dimethyl-1H-pyrazole-4-sulfonyl)-6-[3-(3,3,3-trifluoro-2,2-dimethylpropoxy)-1H-pyrazol-1-yl]-2-[(4S)-2,2,4-trimethylpyrrolidin-1-yl]pyridine-3-carboxamide × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 2.80 Å |
| 8EIQ The complex of phosphorylated human delta F508 cystic fibrosis transmembrane conductance regulator (CFTR) with Trikafta [elexacaftor (VX-445), tezacaftor (VX-661), ivacaftor (VX-770)] and ATP/Mg Deposited 2022-09-15 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1370Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 CLR CHOLESTEROL × 1 D12 DODECANE × 1 VX7 N-(2,4-di-tert-butyl-5-hydroxyphenyl)-4-oxo-1,4-dihydroquinoline-3-carboxamide × 1 WJX (6P)-N-(1,3-dimethyl-1H-pyrazole-4-sulfonyl)-6-[3-(3,3,3-trifluoro-2,2-dimethylpropoxy)-1H-pyrazol-1-yl]-2-[(4S)-2,2,4-trimethylpyrrolidin-1-yl]pyridine-3-carboxamide × 1 CV6 Tezacaftor × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.00 Å |
| 8EJ1 Dephosphorylated human delta F508 cystic fibrosis transmembrane conductance regulator (CFTR) Deposited 2022-09-16 | Different construct Different mutation/modification Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | No recorded non-water small molecule |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 6.90 Å |
| 8FZQ Dehosphorylated, ATP-bound human cystic fibrosis transmembrane conductance regulator (CFTR) Deposited 2023-01-29 | Different construct Different mutation/modification Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
1–1480(1480 aa)
|
Not recorded | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.2
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 4.30 Å |
| 8GLS Complex of human cystic fibrosis transmembrane conductance regulator (CFTR) and Z1834339853 Deposited 2023-03-23 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Not recorded | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 POV (2S)-3-(hexadecanoyloxy)-2-[(9Z)-octadec-9-enoyloxy]propyl 2-(trimethylammonio)ethyl phosphate × 5 ZRH (2S)-1-(3-amino-6-fluoro-1H-indazol-1-yl)-2-methyl-3-phenoxypropan-1-one × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.80 Å |
| 8UBR Complex of the phosphorylated human cystic fibrosis transmembrane conductance regulator (CFTR) with CFTRinh-172 and ATP/Mg Deposited 2023-09-24 | Different construct Different mutation/modification Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 LBN 1-palmitoyl-2-oleoyl-sn-glycero-3-phosphocholine × 2 CLR CHOLESTEROL × 2 WG5 4-[(Z)-{(3M)-4-oxo-2-sulfanylidene-3-[3-(trifluoromethyl)phenyl]-1,3-thiazolidin-5-ylidene}methyl]benzoic acid × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 2.70 Å |
| 8V7Z Phosphorylated, ATP-bound, E1371Q human cystic fibrosis transmembrane conductance regulator (E1371Q-CFTR) Deposited 2023-12-04 | Different construct Different mutation/modification Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
11–1431(1421 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 POV (2S)-3-(hexadecanoyloxy)-2-[(9Z)-octadec-9-enoyloxy]propyl 2-(trimethylammonio)ethyl phosphate × 5 CLR CHOLESTEROL × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.40 Å |
| 8V81 Phosphorylated, ATP-bound, inhibitor 172-bound E1371Q human cystic fibrosis transmembrane conductance regulator Deposited 2023-12-04 | Different construct Different mutation/modification Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain A
3–1440(1438 aa)
|
Mutation:E1371Q | MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 POV (2S)-3-(hexadecanoyloxy)-2-[(9Z)-octadec-9-enoyloxy]propyl 2-(trimethylammonio)ethyl phosphate × 5 CLR CHOLESTEROL × 1 WG5 4-[(Z)-{(3M)-4-oxo-2-sulfanylidene-3-[3-(trifluoromethyl)phenyl]-1,3-thiazolidin-5-ylidene}methyl]benzoic acid × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.60 Å |
| 9DW4 Dephosphorylated CFTR in 1:1 complex with PKA-C (site II) Deposited 2024-10-08 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 3 PDB declaration: trimeric |
Chain A
1–1480(1480 aa)
|
Not recorded | No recorded non-water small molecule |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 9.00 Å |
| 9DW5 Dephosphorylated CFTR in 1:1 complex with PKA-C (site I) Deposited 2024-10-08 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Not recorded | MG MAGNESIUM ION × 2 ANP PHOSPHOAMINOPHOSPHONIC ACID-ADENYLATE ESTER × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.80 Å |
| 9DW7 Dephosphorylated CFTR in 1:2 complex with PKA-C Deposited 2024-10-08 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 4 PDB declaration: tetrameric |
Chain A
1–1480(1480 aa)
|
Not recorded | MG MAGNESIUM ION × 2 ANP PHOSPHOAMINOPHOSPHONIC ACID-ADENYLATE ESTER × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 6.00 Å |
| 9DW8 Dephosphorylated (E1371Q)CFTR in complex with PKA-C Deposited 2024-10-08 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q | B44 N-(2-phenylethyl)adenosine 5'-(tetrahydrogen triphosphate) × 2 MG MAGNESIUM ION × 4 ANP PHOSPHOAMINOPHOSPHONIC ACID-ADENYLATE ESTER × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 3.50 Å |
| 9DW9 Phosphorylated (E1371Q)CFTR in complex with PKA-C Deposited 2024-10-08 | Different construct Different mutation/modification Different oligomeric state Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein heterocomplex Heteromer;Protein × 2 PDB declaration: dimeric |
Chain A
1–1480(1480 aa)
|
Mutation:E1371Q Non-standard monomer:Yes (specific site not provided by mmCIF) | CLR CHOLESTEROL × 1 D10 DECANE × 4 MG MAGNESIUM ION × 4 ATP ADENOSINE-5'-TRIPHOSPHATE × 3 CL CHLORIDE ION × 4 UND UNDECANE × 3 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.4
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 2.80 Å |
| 9MXL Complex of the phosphorylated human cystic fibrosis transmembrane conductance regulator (CFTR) with (R)-BPO-27 and ATP/Mg Deposited 2025-01-20 | Different construct Different mutation/modification Different ligand/ion Different experimental method Different experimental conditions Different structure-quality metrics | Assembly 1 Protein monomer Monomer;Protein × 1 PDB declaration: monomeric |
Chain B
1–1480(1480 aa)
|
Mutation:E1371Q | A1BUJ (6R,12R)-6-(5-bromofuran-2-yl)-7,9-dimethyl-8,10-dioxo-11-phenyl-7,8,9,10-tetrahydro-6H-pyrimido[4',5':3,4]pyrrolo[2,1-c][1,4]benzoxazine-2-carboxylic acid × 1 MG MAGNESIUM ION × 2 ATP ADENOSINE-5'-TRIPHOSPHATE × 2 CL CHLORIDE ION × 1 |
ELECTRON MICROSCOPY
cryo-EM buffer
pH 7.5
cryo-EM vitrification conditions
Cryogen ETHANE
|
Resolution 2.10 Å |
52 other PDB entries and 69 assemblies. Open the comparison page and filter oligomeric states
View Construct and Data Evidence
| UniProt name | CFTR_HUMAN |
| Isoform | — |
| PDB entities | 1 |
| Chains and sequence ranges | Author chain A; PDBConstruct 1–226; UniProt 388–646 Author chain B; PDBConstruct 1–226; UniProt 388–646 |