9evm

High pH (8.0) nitrite-bound MSOX movie series dataset 30 of the copper nitrite reductase (NirK) from Bradyrhizobium japonicum USDA110 [20.7 MGy]

Method: X-RAY DIFFRACTION
▼

1. Protein Identity and Related Structures Protein Identity & Related Structures

Copper-containing nitrite reductase

Bradyrhizobium sp.

UniProt Q89EJ6

State in the Current Structure

Assembly Physical composition Protein state Molecular copy count Associated components Data consistency
1 Other combination Homooligomer Protein 3 其他Polymer 3 beta-D-fructofuranose-(2-1)-alpha-D-glucopyranose × 3 COPPER (II) ION × 6 NITRITE ION × 6 SULFATE ION × 12 water × 3 Consistent with protein count

Other States of the Same Protein in the Database

View Construct and Data Evidence
UniProt name Q89EJ6_BRADU
Isoform —
PDB entities 1
Chains and sequence ranges Author chain A; PDBConstruct 1–367; UniProt 1–367

The page prioritizes protein identity, the current assembly, associated components, oligomeric state and cross-PDB links. Chain mapping and sequence ranges are retained as data evidence. Internal IDs, import timestamps and assembly operation expressions are maintenance fields and are not shown here.

▼

2. Structure Basics 2. Structure Basics

Entry ID entry_id9evm
Deposition date deposition_date2024-03-30
Structure title titleHigh pH (8.0) nitrite-bound MSOX movie series dataset 30 of the copper nitrite reductase (NirK) from Bradyrhizobium japonicum USDA110 [20.7 MGy]
Keywords keywordselectron transfer, Nitrite binding, nitrite reductase, OXIDOREDUCTASE; OXIDOREDUCTASE
Experimental Method methodX-RAY DIFFRACTION
▼

3. Official assembly/model SAXS Official SAXS Profiles

This page reads only the latest assembly calculations. Every curve maps to an explicit PDB entry, official biological assembly and coordinate model.

9evm__assembly_1__model_1

Assembly 1 · Model 1 · CRYSOL 4.1.3-1-20251215 (887e7ef)

Download this curve (.dat)

9evm__assembly_1__model_1 | I(q)

10-2 10-1 106 107 108 q (1/Angstrom) I(q)
100 plotted points; both axes use logarithmic scales.

9evm__assembly_1__model_1 | P(r) · Pending

The new assembly/model P(r) has not been calculated yet This placeholder does not display legacy data r (Angstrom) P(r)
P(r) will be calculated and displayed separately for the same assembly/model.
Rg(Guinier)29.05 Å
Rg (electron density)27.92 Å
Total Rg28.92 Å
Atom count15456
Residues1002
Excluded volume138830 ų
Maximum q0.500 Å⁻¹
Assembly Model Structure unit Oligomeric description Status CRYSOL Actions
1 1 9evm__assembly_1__model_1 trimeric (3) Success 4.1.3-1-20251215 (887e7ef) View Download
▶

4. Crystallography and Experiment 4. Crystallography & Experiment

▶

5. Entities and Polymers Entities & Polymers (6)

▶

7. Citations (1)