7evm

Cryo-EM structure of the compound 2-bound human GLP-1 receptor-Gs complex

Method: ELECTRON MICROSCOPY
▼

1. Protein Identity and Related Structures Protein Identity & Related Structures

Guanine nucleotide-binding protein G(s) subunit alpha isoforms short

Homo sapiens

UniProt P63092

State in the Current Structure

Assembly Physical composition Protein state Molecular copy count Associated components Data consistency
1 Protein heterocomplex Heteromer Protein 5 Guanine nucleotide-binding protein G(I)/G(S)/G(T) subunit beta-1 × 1 (P54311) Guanine nucleotide-binding protein G(I)/G(S)/G(O) subunit gamma-2 × 1 (P63212) Nanobody-35 × 1 Glucagon-like peptide 1 receptor × 1 (P43220) N-tert-butyl-6,7-bis(chloranyl)quinoxalin-2-amine × 1 CHOLESTEROL × 6 Consistent with protein count

Other States of the Same Protein in the Database

View Construct and Data Evidence
UniProt name GNAS2_HUMAN
Isoform —
PDB entities 1
Chains and sequence ranges Author chain A; PDBConstruct 1–394; UniProt 1–394

Guanine nucleotide-binding protein G(I)/G(S)/G(T) subunit beta-1

Rattus norvegicus

UniProt P54311

State in the Current Structure

Assembly Physical composition Protein state Molecular copy count Associated components Data consistency
1 Protein heterocomplex Heteromer Protein 5 Guanine nucleotide-binding protein G(s) subunit alpha isoforms short × 1 (P63092) Guanine nucleotide-binding protein G(I)/G(S)/G(O) subunit gamma-2 × 1 (P63212) Nanobody-35 × 1 Glucagon-like peptide 1 receptor × 1 (P43220) N-tert-butyl-6,7-bis(chloranyl)quinoxalin-2-amine × 1 CHOLESTEROL × 6 Consistent with protein count

Other States of the Same Protein in the Database

View Construct and Data Evidence
UniProt name GBB1_RAT
Isoform —
PDB entities 2
Chains and sequence ranges Author chain B; PDBConstruct 7–345; UniProt 2–340

Guanine nucleotide-binding protein G(I)/G(S)/G(O) subunit gamma-2

Bos taurus

UniProt P63212

State in the Current Structure

Assembly Physical composition Protein state Molecular copy count Associated components Data consistency
1 Protein heterocomplex Heteromer Protein 5 Guanine nucleotide-binding protein G(s) subunit alpha isoforms short × 1 (P63092) Guanine nucleotide-binding protein G(I)/G(S)/G(T) subunit beta-1 × 1 (P54311) Nanobody-35 × 1 Glucagon-like peptide 1 receptor × 1 (P43220) N-tert-butyl-6,7-bis(chloranyl)quinoxalin-2-amine × 1 CHOLESTEROL × 6 Consistent with protein count

Other States of the Same Protein in the Database

View Construct and Data Evidence
UniProt name GBG2_BOVIN
Isoform —
PDB entities 3
Chains and sequence ranges Author chain G; PDBConstruct 1–70; UniProt 2–71

Glucagon-like peptide 1 receptor

Homo sapiens

UniProt P43220

State in the Current Structure

Assembly Physical composition Protein state Molecular copy count Associated components Data consistency
1 Protein heterocomplex Heteromer Protein 5 Guanine nucleotide-binding protein G(s) subunit alpha isoforms short × 1 (P63092) Guanine nucleotide-binding protein G(I)/G(S)/G(T) subunit beta-1 × 1 (P54311) Guanine nucleotide-binding protein G(I)/G(S)/G(O) subunit gamma-2 × 1 (P63212) Nanobody-35 × 1 N-tert-butyl-6,7-bis(chloranyl)quinoxalin-2-amine × 1 CHOLESTEROL × 6 Consistent with protein count

Other States of the Same Protein in the Database

View Construct and Data Evidence
UniProt name GLP1R_HUMAN
Isoform —
PDB entities 5
Chains and sequence ranges Author chain R; PDBConstruct 1–440; UniProt 24–463

The page prioritizes protein identity, the current assembly, associated components, oligomeric state and cross-PDB links. Chain mapping and sequence ranges are retained as data evidence. Internal IDs, import timestamps and assembly operation expressions are maintenance fields and are not shown here.

▼

2. Structure Basics 2. Structure Basics

Entry ID entry_id7evm
Deposition date deposition_date2021-05-21
Structure title titleCryo-EM structure of the compound 2-bound human GLP-1 receptor-Gs complex
Keywords keywords;Glucagon-like peptide-1 receptor, Ago-allosteric modulator, Type 2 diabetes, Compound 2, Class B GPCR, BIOSYNTHETIC PROTEIN, STRUCTURAL PROTEIN ;; STRUCTURAL PROTEIN
Experimental Method methodELECTRON MICROSCOPY
▼

3. Official assembly/model SAXS Official SAXS Profiles

This page reads only the latest assembly calculations. Every curve maps to an explicit PDB entry, official biological assembly and coordinate model.

7evm__assembly_1__model_1

Assembly 1 · Model 1 · CRYSOL 4.1.3-1-20251215 (887e7ef)

Download this curve (.dat)

7evm__assembly_1__model_1 | I(q)

10-2 10-1 106 107 108 q (1/Angstrom) I(q)
100 plotted points; both axes use logarithmic scales.

7evm__assembly_1__model_1 | P(r) · Pending

The new assembly/model P(r) has not been calculated yet This placeholder does not display legacy data r (Angstrom) P(r)
P(r) will be calculated and displayed separately for the same assembly/model.
Rg(Guinier)34.04 Å
Rg (electron density)34.00 Å
Total Rg34.47 Å
Atom count8555
Residues1037
Excluded volume151900 ų
Maximum q0.500 Å⁻¹
Assembly Model Structure unit Oligomeric description Status CRYSOL Actions
1 1 7evm__assembly_1__model_1 pentameric (5) Success 4.1.3-1-20251215 (887e7ef) View Download
▶

4. Crystallography and Experiment 4. Crystallography & Experiment

▶

5. Entities and Polymers Entities & Polymers (7)

▼

6. Fold Classification (SCOP + CATH) 2 domains

CATH v4.4 (2 domains)

Domain ID domain_id7evmB01
Class class2 — Mainly Beta
Architecture architecture130 — 7 Propeller
Topology topology10 — Methylamine Dehydrogenase; Chain H
Homologous superfamily homologous superfamily10 — YVTN repeat-like/Quinoprotein amine dehydrogenase
Domain ID domain_id7evmN01
Class class2 — Mainly Beta
Architecture architecture60 — Sandwich
Topology topology40 — Immunoglobulin-like
Homologous superfamily homologous superfamily10 — Immunoglobulins
▶

7. Citations (1)